Project Overview
The video below will walk you through the content on the website and project a brief project overview:
The proposed improvements along Carnegie Avenue will include:
-
Full and partial depth pavement repairs as needed, and complete asphalt resurfacing.
-
New sidewalk, ADA-compliant curb ramps and drive aprons as necessary.
-
Replacement of an existing 8” water main with a 12” water main from East 79th Street to Stearns Road.
-
Replacement of existing catch basins as needed.
-
Signal upgrades at East 83rd Street, East 90th Street, East 96th Street, East 100th Street, Stokes Boulevard, Stearns Road, MLK Jr. Drive and MLK Jr. Drive/Cedar Avenue.
-
Existing signals at East 79th Street, East 86th Street, East 102nd Street and East 105th Street will not need upgrades.
-
Providing Thermoplastic Pavement Striping for durability and upgrading road signs as necessary.
-
High Visibility Ladder Style Crosswalks will be replicated along the corridor.
-
Low Mow tree lawns will be added in many locations.
​
Project Schedule:
Construction Starts July 2025
Construction Completion November 2026
Construction Cost: $9,858,511.37 Awarded to Terrace Construction Co., Inc.
​
Project Funding Sources:
-
Ohio Public Works Commission (Issue 1 Funds) - $5,312,216.00
-
City Road & Bridge Bonds, Public Utility Funds - $4,546,295.37
​
Cleveland City Council Representatives:​
-
Blaine A. Griffin, Ward 6 – Council President
​
Construction Team:
City of Cleveland
-
Ron Mason, PE, Construction Section Chief
-
Paul Fatica, PE, City Project Manager
-
Walter Wilson, Inspector (216) 857-7501
-
Eric Faehner, Inspector (216) 857-3028
​
Emergency Contacts
-
Dan O’Day, Contractor Project Manager
Terrace Construction (216) 952-5822​
-
Dave Mariola, Concrete Superintendent
Terrace Construction (330) 697-8647
-
Tim Leap, Water Superintendent
​Terrace Construction (216) 701-3266
-
Rik Luzader, Operations Manager
​Terrace Construction (330) 321-8330