top of page

PROPOSED LANE USE & PAVEMENT MARKINGS

CARNEGIE AVENUE - EAST 79TH STREET TO MLK JR. DRIVE

The image below shows the existing and proposed lane use typical section along Carnegie Avenue. Existing and proposed lane-use will be the same.

image.png

In addition to rehabilitating the pavement to create a long lasting smooth driving surface, new pavement markings will be installed along the corridor. Existing and proposed pavement markings will be the same which includes two travel lanes in each direction, a center turn lane and left turn lanes at intersections. A representative section of the corridor from East 83rd Street to East 86th Street is shown below. 

Screenshot 2024-02-23 104012.png
bottom of page